Almost finished

Almost finished
dwarfs the beach house

Friday, August 29, 2014

More floor work!

Yesterday was busy!
I had the HVAC guys come back.  They had to wrap some line to pass inspection.   They also ripped out the old floor gas furnace.  That left a gaping hole in the floor.  It was at least 3 ft x 3 ft!  Clear down into the sandy crawl space.

Also the kitchen cabinet designer came back.  He will work on the redesign so we don't have to modify the current good cabinets and granite.  I shopped for wall ovens and dishwashers.   I think I'm getting a dishwasher drawer to save space.

Them another window guy came to estimate .  I just said yes because the last guy never called me back w a quote despite the fact I called him 2 times to see if he had that quote.   I guess he's got enough business and didn't need mine.  Jerk!

I spent the rest of the day unpacking kitchen stuff, got thru 5 boxes.   So no more plastic utensils!

I also asked the city to rearrange the electric from a large unsightly wire attached to the peak of the house , to an underground option.   And they said YES!   I just have to have an
Electrician  change the base meter!  I called and I think he will schedule for next week!


Love the bedroom upstairs!   Now I can  actually organize my officer  in the former bedroom downstairs.   Also with the mini split and the ceiling fan, the temp is more controlled upstairs!   Much more comfortable sleeping!
Did I mention we had the sink installed upstairs, too. It looks great and I just had the mirror arrive today.  Got it from pottery barn teen.  But it's just what I wanted and fits the space with the eve angle perfectly!

Tomorrow I will stain the new floor patch and the new door.  J will hang it and add the door nob!    Then we can go get the boys!   They have been at grandmas for 2 months!  Can't believe it's been that long.  I miss them!

No comments:

Post a Comment