PLUMBING

water heater will be ABOVE washer and dryer, inside to protect it from salty water and spray! 

a close up of the on demand, gas water heater

lovely beveled subway tile set at 1/3 spacing, looks so clean! 

these were the old plumbing pipes: replaced

disgusting old pipes from kitchen sink

Monday, November 28, 2016

Contractors 11/28/16

Today, the Monday after thxgiving I had:

The tile guy: Jessie come work on the floor.   He cut the large tiles to accommodate the penny tile wave.

The Window guys returned to do some trim, but had to call 2 different guys, to get the filler and the correct size trim.  They could not do the bathroom window, because the tile was wet.

They did not finish the windows in the office, because they need a missing piece for the lock.
They did teach me how to correctly close the windows and lock them, and how to add the window screens which are inside the house, not on the outside.

The Va Natural gas man, he checked on the meter, repainted it, and got it set up for plumbers tomorrow.

The chimney guys, said the new roof flashing sucked and I need a cap, but there are no obstructions.
So for $913, including a 15% military discount, they will fix the flashing and cap it w a stainless steel cap.
The mini- wood burning FP is an option, but I will need an insert into the chimney. Will research that and possibly do it at a later time.

Now I need to go to laundromat and to home depot, need more PRIMER KILZ.

Tomorrow PLUMBER!
And jessie (tile guy said he'd be back at 8 am -ish!

laundry area, painted a JADE MIST

still need to pain, under the stairs. This is where murphy bed will go. 

Saturday, November 5, 2016

New Windows!!

CUTTING OUT the larger opening, forgot to remove the old bathtub thru the big hole!
the frame hanging out, waiting to be placed.
setting in the bay window.  Took ALL DAY!

Thursday, November 3, 2016

more work, heated floor

stylish  and functional grab bar, will install fold down teak seat at a later date

removing window in new closet/laundry area

new bathroom floor, shower in grey

starting the process for the heated bathroom floor

Schlüter system, keeps floor at constant temp. you set via thermostat. 